Welcome to Francis Academic Press

Academic Journal of Business & Management, 2023, 5(20); doi: 10.25236/AJBM.2023.052005.

A review of research related to risk management of EPC engineering projects and future prospects

Author(s)

Wei Qianqing1, Xiao Yiqing2

Corresponding Author:
Wei Qianqing
Affiliation(s)

1School of Economics, China ASEAN Financial Co-operation Institute, Guangxi University, Nanning, Guangxi, 530000, China

2School of Economics, China ASEAN Financial Co-operation Institute, Guangxi University, Nanning, Guangxi, 530000, China

Abstract

EPC general engineering contracting mode is a kind of contracting method widely used in large-scale engineering construction activities at present. This mode provides a new mode for the completion of large-scale projects, which has played a certain role in promoting China's economic development, while its problems are also becoming more and more obvious. At present, with the "Belt and Road" initiative and the establishment of RCEP, a large number of cross-border EPC projects to carry out the implementation of the academic community for the EPC general contracting mode of research continues to be hot, to explore the main risk management mechanism. In this paper, the relevant literature is sorted out according to the chronological order and importance, and the conceptual definition of EPC general contracting model is summarised, and it is also found that the research on risk management in the existing literature is mainly from the four aspects of risk identification, risk evaluation and measurement, risk control and response, and digitalisation of risk management. The results of this paper not only summarise the main literature on risk management in EPC projects, but also clarify the strengths and weaknesses of the relevant research, providing a development direction for future research.

Keywords

general EPC contracting model; risk management; digitalisation; optimisation and innovation

Cite This Paper

Wei Qianqing, Xiao Yiqing. A review of research related to risk management of EPC engineering projects and future prospects. Academic Journal of Business & Management (2023) Vol. 5, Issue 20: 25-34. https://doi.org/10.25236/AJBM.2023.052005.

References

[1] Chen Qiuyun. Research on EPC procurement risk control strategy based on BIM technology [J]. Residence, 2022(05):149-151. 

[2] Cheng Xun. Research on tax differences and risks of EPC projects under the new revenue standard [J]. Construction Economy, 2020, 41(10):38-41. 

[3] Dai Jianbiao, Gao Xinglin, Zhang Mingkong. Risk evaluation and response to the bidding of design and construction general contracting for Hong Kong-Zhuhai-Macao Bridge island tunnel project [J]. Tunnel Construction(in English and Chinese), 2018, 38(07):1138-1148. 

[4] Fan Shuqing. Risk Sharing and Response of Owners and Contractors under EPC Mode[J]. Urban Architecture, 2020, 17(06):178-180. 

[5] Fan Leilei. Analysis of design-based EPC cost risk factor identification based on interface management [J]. Construction Economy, 2018, 39(10):86-89. 

[6] Gong Yanjun, Han Yanfeng. Efficient safety management in the whole life cycle of EPC+O construction projects through BIM+FM technology [J]. Intelligent Building and Smart City, 2022(11):57-59. 

[7] Hu Judan, Tang Shuang, Yang Minjie. Risk evaluation of BIM technology application in EPC projects [J]. Engineering Economy, 2021, 31(04):68-73. 

[8] Jiang Xiaodong, Liu Jia. Legal Risks and Preventive Measures of Construction Enterprises under F+EPC Mode [J]. Construction Economy, 2021, 42(S2):24-27. 

[9] Jiang Xue. Analysis of the financial risk of general engineering contracting project[J]. Finance and accounting monthly, 2019(S1):95-96. 

[10] Li Hao, Tang Wenzhe, Shen Wenxin, Wang Yunhong. Research on claim management of domestic EPC project--Taking Yangfanggou hydropower station as an example[J]. Construction Economy, 2020, 41(04):59-63. 

[11] Li Hongyu, Zhang Hao, Wang Yuxin, Cheng Sujuan. Contract risk analysis and countermeasures of EPC project based on the principle of responsibility and right[J]. Construction Economy, 2021, 42(S1):128-131. 

[12] Li Huiling, Mou Yonglin. Research on risk management of general contracting project under EPC mode [J]. Construction Economy, 2020, 41(S1):103-107. 

[13] Liu Miaomiao, Yao Xiaoqiu, Li Huiping. Tax risk prevention in the contract signing stage of international EPC engineering projects [J]. Finance and Accounting, 2019(17):54-56. 

[14] Liu Xue, Guo Haibin, Zhao Ranran. Evaluation of cost risk of assembly building under EPC mode based on cloud model [J]. Journal of Heilongjiang Engineering Institute, 2022, 36(05):38-43. 

[15] Liu Yanping, Wang Wenzhong, Pu Wanli. Cost risk evaluation of assembly construction project under EPC mode based on portfolio assignment-evidence theory-fuzzy comprehensive evaluation method [J]. Science, Technology and Engineering, 2022, 22(11):4562-4571. 

[16] Nan Yijia, Dong Guanhua. EPC Contract Splitting Risk and Response[J]. Project Management Review, 2022(04):68-71. 

[17] Qin Wei, Zhang Lili, Shao Kangjie, Zhang Zhuoqun, Wang Quan. EPC procurement risk control strategy based on BIM technology [J]. Value Engineering, 2019, 38(12):73-76. 

[18] Shi Danqing. Research on risk evaluation of design institute-led EPC model based on entropy right-FAHP [J]. Construction Economy, 2021, 42(S1):132-135. 

[19] Song Yuanqi. Cost risk identification and control in construction phase of EPC general contracting for water conservancy project[J]. People's Yellow River, 2022, 44(S1). 

[20] Qin Jian. Discussion on the prevention of operation risk of water conservancy EPC project--Taking Nan'ao Island water supply project as an example [J]. People's Yangtze River, 2021, 52(S2):255-258. 

[21] Tao Zicheng, He Yanfang. Application of fuzzy comprehensive judgement risk management technique in bidding decision of EPC project[J]. International Economic Cooperation, 2015(09):83-86. 

[22] Tu Liqiong. Discussion on whole process tracking audit of engineering construction projects under EPC mode [J]. Finance and accounting newsletter, 2022(11):118-122+176. 

[23] Wang J. Risks and responses faced by university project owners under EPC mode[J]. Construction Economy, 2021, 42(S1):139-142. 

[24] Wang Tengfei, Wang Yunhong, Shen Wenxin, Tang Wenzhe. Partnership-based risk management for international EPC projects[J]. Journal of Tsinghua University (Natural Science Edition), 2022, 62(02):242-249. 

[25] Wang Zhuofu, Tao Xiaoping, Ding Jiyong, Li Qichang, Tian Junrui. Optimisation of transaction governance structure for major water conservancy and hydropower projects EPC[J/OL]. China Rural Water Conservancy and Hydropower:1-9[2022-11-20]. 

[26] Wu Lingfeng, Gan Lisheng. Exploration on the allocation optimisation of anti-terrorism resources in overseas EPC projects[J]. Construction Technology, 2017, 46(S2):724-727. 

[27] Xu Zao. Research on risk assessment of overseas EPC project based on system dynamics--Taking the EPC project of Lania oil field construction in Chad as an example [J]. China Safety Production Science and Technology, 2019, 15(S2):52-57. 

[28] Xu Peng. Avoidance strategy of market risk in EPC contract management of overseas projects[J]. Heilongjiang traffic science and technology, 2021, 44(05):238-239. 

[29] Yang Jian. Management thinking of consortium cooperation mode led by design unit in EPC project [J]. Construction Economy, 2022, 43(10):43-48. 3. 

[30] Yang Rong, Zhang Weifang. An overview of common problems in the architectural design of international power EPC projects--Taking the 1×20 MW coal-fired power plant project in Iligan, Republic of the Philippines as an example[J]. Journal of Wuhan University (Engineering Edition), 2018, 51(S1):360-363. 

[31] Ye Zhongping, EPC mode contractor investment control problems and countermeasures [J]. Construction Economy, 2022, 43(05):23-29. 

[32] Yu Ke, Qiu Mingke, Wei Mingkun. Risk and control of substitute construction for EPC project of new campus of vocational college [J]. Construction Economy, 2022, 43(S1):682-684. 

[33] Yu Hongliang, Chen Jialuo. Research on risk chain of green building project under EPC mode based on SEM [J]. Science and Technology Management Research, 2021, 41(17):199-205. 

[34] Yuan Ximan, Gao Xing, Li Jingjing. Risk identification of highway projects under BOT+EPC mode based on "risk map"[J]. Transport Enterprise Management, 2015, 30(10):55-57. 

[35] Zheng Xiaoyun, Chen Zhenxing, Chen Jinyan. Research on EPC incentives based on two-layer chained principal-agent[J]. Journal of Engineering Management, 2022, 36(02):103-107. 

[36] Zhu Xiaoyu, Wang Sheng. Research on risk factors of EPC project bidding and procurement in universities based on cross-influence method [J]. Experimental Technology and Management, 2022, 39(04): 249-254

[37] Zhu Yi, Li Jiqin, Wei Yan, Li Hui, Nan Song, Li Xiaodong. A study on risk factor classification of EPC international projects based on the perspective of general contractors[J]. Journal of Engineering Management, 2012, 26(05):1-6.