Academic Journal of Computing & Information Science, 2022, 5(1); doi: 10.25236/AJCIS.2022.050108.
Shiyu Tian1, Yangyang Guo2, Shengyan Liao2
1College of General Education, Hunan University of Information Technology, Changsha, Hunan, 410100, China
2School of Electronic Science And Engineering, Hunan University of Information Technology, Changsha, Hunan, 410100, China
How to develop material ordering and transferring plans in advance to ensure smooth production of the enterprise is a major problem faced by the actual production process. In this paper, we make reasonable assumptions by combining the ordering supply and transshipment data of previous years and establish a supply-transshipment model based on 0-1 planning. Firstly, we selected the Supply and demand ratio, large order ratio, Supply error rate, and Supply rate as the evaluation indexes, and then established the evaluation model to select the top 50 from 402 suppliers. To make the ordering and transferring plans in the next 24 weeks, we firstly analyzed the objectives and constraints. A multi-objective planning model is established and it is transformed into a single-objective 0-1 planning model.
multi-objective planning, 0-1 planning, evaluation indexes
Shiyu Tian, Yangyang Guo, Shengyan Liao. Material Ordering and Transferring Plan Development Based on 0-1 Planning Model. Academic Journal of Computing & Information Science (2022), Vol. 5, Issue 1: 40-43. https://doi.org/10.25236/AJCIS.2022.050108.
[1] Liu, Qiu-Liang; Ding, Specialized-Xin. A class of decomposable 0-1 planning algorithms [J]. Journal of Management Engineering, 1995, (01).
[2] Cheng Cheng-Yun. A 0-1 planning model for optimal ranking of enterprise cooperative processing [J]. Journal of Three Gorges University (Natural Science Edition), 2002, (05): 451-452.
[3] Huo Junshang; Zhu Cuijuan; Zhang Ruodong; Tai Zhiyan; Sun Qingfeng; Wang Liuxing. Study on the location of the distribution center in Changchun based on 0-1 planning [J]. Logistics Technology, 2015, (20): 112-113+121.