Welcome to Francis Academic Press

Academic Journal of Business & Management, 2019, 1(3); doi: 10.25236/AJBM.2019.010301.

The specific methods of the upgrade of the prefabricated construction industry

Author(s)

Jiao Lou

Corresponding Author:
Jiao Lou
Affiliation(s)

College of Civil Engineering and Architecture , ZheJiang University, Hangzhou 310058, China

Abstract

With the industrialization and modernization of construction industry, prefabricated construction industry becomes more and more important. In this paper, we explore some major methods, including technological services, business services and policy support, to promote the upgrade of the prefabricated construction industry. Based on the analysis of specific promotion methods, the paper presents detailed upgrading prefabricated building features of each stage, leading to the guidance for the upgrade of the prefabricated building industry.

Keywords

prefabricated construction industry, upgrade, technological services, business services , policy support

Cite This Paper

Jiao Lou. The specific methods of the upgrade of the prefabricated construction industry. Academic Journal of Business & Management (2019) Vol. 1, Issue 3: 1-9. https://doi.org/10.25236/AJBM.2019.010301.

References

[1]Jardon, B. C. S. M. A. . (2008). Building industrialization: robotized assembly of modular products. Assembly Automation, vol.28, no.2, pp. 134-142.
[2]Fastabend, M. ,  Albert, M. , &  Steller, V. (2015). Optimierungskonzepte für deckensysteme – von halbfertigteilen bis zur fertigteilbauweise. Beton- und Stahlbetonbau, vol.109, no.10, pp. 689-698.
[3]Kalasapudi, V. S. ,  Tang, P. ,  Zhang, C. ,  Diosdado, J. , &  Ganapathy, R.  (2015). Adaptive 3d imaging and tolerance analysis of prefabricated components for accelerated construction. Procedia Engineering, vol.118, pp. 1060-1067.
[4]Xiangrong, D. , &  Wenqiang, L. (2013). The empirical research of financial agglomeration on industrial structure upgrade: based on the esda model. Nanjing Journal of Social Sciences.
[5]Soete, L.(2007). From industrial to innovation policy. Journal of Industry, Competition and Trade, vol.7, no.3-4, pp. 273-284.
[6]Sharma, P. K. ,  Chen, M. Y. , &  Park, J. H. (2017). A software defined fog node based distributed blockchain cloud architecture for iot. IEEE Access, vol.26. pp. 115 - 124.
[7]Qi-Liang, M.(2019). Opportunity identification and basic path of industrial upgrading in typical urban agglomerations of central and western china: a study based on product space theory. West Forum.
[8]Carmona, J.  (1987). Rational use of prefabricated parts in the construction of the removable partial denture frameworks. Rev Fr Prothes Dent, vol.21, no.81, p33-40.
[9]Hofstetter, W. ,  Weck, O. D. , &  Crawley, E.(2005). Modular building blocks for manned spacecraft: a case study for moon and mars landing systems. Incose International Symposium, vol.15, no.1, pp.1296–1312.
[10]Qi, B. K. , &  Li, C. F.  (2014). Whole life cycle management of prefabricated construction research based on bim technology. Applied Mechanics and Materials, vol .536-537, pp.1705-1708.
[11]Poirier, E. A. ,  Staub-French, S. , &  Forgues, D. (2015). Measuring the impact of bim on labor productivity in a small specialty contracting enterprise through action-research. Automation in Construction, vol .58, pp.74-84.