Academic Journal of Computing & Information Science, 2024, 7(2); doi: 10.25236/AJCIS.2024.070213.

A Resource Allocation Model for Deep Uncertainty (RAM-DU) Based on Nonlinear Optimization

Author(s)

Lei Yao

Corresponding Author:
Lei Yao
Affiliation(s)

Zeekr Intelligent Technology Holding Limited, Hangzhou City, China

Abstract

Deep uncertainty usually refers to problems with epistemic uncertainty in which the analyst or decision maker has very little information about the system, data are severely lacking, and different mathematical models to describe the system may be possible. Since little information is available to forecast the future, selecting probability distributions to represent this uncertainty is very challenging. Traditional methods of decision making with uncertainty may not be appropriate for deep uncertainty problems. This paper introduces a novel approach to allocate resources within complex and very uncertain situations. The resource allocation model, which is built by nonlinear optimization within utility function for deep uncertainty (RAM-DU) incorporates different types of uncertainty (e.g., parameter, structural, model uncertainty) and can consider every possible model, different probability distributions, and possible futures. Instead of identifying a single optimal alternative as in most resource allocation models, RAM-DU recommends an interval of allocation amounts. The RAM-DU solution generates an interval for one or multiple decision variables so that the decision maker can allocate any amount within that interval and still ensure that the objective function is within a predefined level of optimality for all the different parameters, models, and futures under consideration. RAM-DU is applied to allocating resources to prepare for and respond to a Deepwater Horizon-type oil spill. The application identifies allocation intervals for how much should be spent to prepare for this type of oil spill and how much should be spent to help industries recover from the spill.

Keywords

deep uncertainty, resource allocation model, nonlinear optimization, probability distribution

Cite This Paper

Lei Yao. A Resource Allocation Model for Deep Uncertainty (RAM-DU) Based on Nonlinear Optimization. Academic Journal of Computing & Information Science (2024), Vol. 7, Issue 2: 91-101. https://doi.org/10.25236/AJCIS.2024.070213.

References

[1] Agusdinata, B., 2008. Exploratory modeling and analysis: a promising method to deal with deep uncertainty. 

[2] Bankes, S., 1993. Exploratory modeling for policy analysis. Operations research, 41(3), pp. 435-449. 

[3] Ben-Haim, Y., 2001. Information-gap decision theory: decisions under severe uncertainty. San Diego, California: Academic Press. 

[4] Ben-Haim, Y., 2004. Uncertainty, probability and information gaps. Reliability engineering & system safety, 85(1), pp. 249-266. 

[5] Bier, V.M. and Abhichandani, V., 2003. Optimal allocation of resources for defense of simple series and parallel systems from determined adversaries. In Risk-based decision making in water resources X (pp. 59-76). 

[6] Boyd, S. and Vandenberghe, L., 2004. Convex optimization. Cambridge, U.K.: Cambridge University Press. 

[7] Cox, L.A.T., 2012. Confronting deep uncertainties in risk analysis. Risk Analysis, 32(10), pp.1607-1629.

[8] Courtney, H., 2001. 20/20 foresight: Crafting strategy in an uncertain world. Boston: Harvard Business Press. 

[9] Croskerry, P., 2009. A universal model of diagnostic reasoning. Academic medicine, 84(8), pp.1022-1028. 

[10] DeGroot, M.H., 1988. A Bayesian view of assessing uncertainty and comparing expert opinion. Journal of statistical planning and inference, 20(3), pp.295-306. 

[11] Dillon, R. L., Paté-Cornell, M. E., and Guikema, S. D. (2005). Optimal use of budget reserves to minimize technical and management failure risks during complex project development. IEEE Transactions on Engineering Management 52(3), 382-395. 

[12] Etkin, D.S., 2004, April. Modeling oil spill response and damage costs. In Proceedings of the Fifth Biennial Freshwater Spills Symposium. 

[13] Floricel, S. and Miller, R., 2001. Strategizing for anticipated risks and turbulence in large-scale engineering projects. International Journal of project management, 19(8), pp.445-455. 

[14] Ferson, S., Kreinovich, V., Ginzburg, L., Myers, D.S. and Sentz, K., 2003. Constructing probability boxes and Dempster-Shafer structures (pp. 1896-1901). Technical report, Sandia National Laboratories. 

[15] Grander, M.M. and Max, H., 1990. A guide to dealing with uncertainty in quantitative risk and policy analysis. Cambridge, U.K.: Cambridge University Press. 

[16] Guikema, S.D., and Paté-Cornell, M.E. (2002). Component choice for managing risk in engineered systems with generalized risk/cost functions. Reliability Engineering and System Safety 78(3), 227-237. 

[17] Hall, J.W., Lempert, R.J., Keller, K., Hackbarth, A., Mijere, C. and McInerney, D.J., 2012. Robust climate policies under uncertainty: a comparison of robust decision making and info-gap methods. Risk Analysis, 32(10), pp.1657-1672. 

[18] Hallegatte, S., Shah, A., Brown, C., Lempert, R. and Gill, S., 2012. Investment decision making under deep uncertainty–application to climate change (September 1, 2012). World Bank Policy Research Working Paper No. 6193. Available at SSRN: https://ssrn.com/abstract=2143067 

[19] Hamarat, C., Kwakkel, J.H. and Pruyt, E., 2013. Adaptive robust design under deep uncertainty. Technological Forecasting and Social Change, 80(3), pp.408-418. 

[20] Heal, G. and Millner, A., 2014. Reflections: Uncertainty and decision making in climate change economics. Review of Environmental Economics and Policy, 8(1), pp.120-137.