Teaching practice of artificially lowering groundwater level in the course of hydraulic engineering construction

Author(s)

Shoukai Chen

Corresponding Author:
Shoukai Chen
Affiliation(s)

School of Water Conservancy, North China University of Water Resources and Electric Power, Zhengzhou, 450045, China

Abstract

The course of hydraulic engineering construction involves many contents, wide scope and short class hours, and teachers often do not have enough time to teach many knowledge points that need to be mastered in practical projects, among which the knowledge point of "artificially lowering groundwater level" has this characteristic.Based on tube-well method and well-point method, this paper designs the teaching path based on the concept of case teaching method, and makes use of effect drawings, engineering drawings, PPT animation, FLASH animation and engineering cases in limited class hours to make students understand the basic principles, technical characteristics, scope of application, design and calculation of these two0 methods. Finally, the students can initially master the calculation of the displacement of foundation pit, the number and layout of pipe wells in artificially lowering groundwater level, and have the preliminary ability of engineering practice.

Keywords

Hydraulic engineering construction; Artificially lowering groundwater level; Tube-well method; Well-point method; Case teaching method

Cite This Paper

Shoukai Chen. Teaching practice of artificially lowering groundwater level in the course of hydraulic engineering construction. International Journal of New Developments in Education (2023) Vol. 5, Issue 6: 13-17. https://doi.org/10.25236/IJNDE.2023.050603.

References

[1] Qiu Zhenyu. Talk about the course characteristics and teaching methods of hydraulic engineering construction [J]. Teaching and Research, 1993 (01): 22-24.

[2] Wang Zhijun, Gong Chengyong, Wang Yu. Exploration and practice of the Cooperative Education Mode of "Curriculum thought and Politics" under the background of Educational Informatization-- taking the course of "hydraulic Engineering Construction" as an example [J]. Educational Informatization in China, 2021 (20): 56-61.

[3] Wu Xinjia, Qi Xiaoming, Pan Zhengwei, Yang Lan, Wang Yanfang. Application of PBL teaching method in the course of hydraulic engineering construction [J]. Journal of Shaoguan University, 2019, 40 (08): 101-104.

[4] He Kui. Innovation of teaching mode of digital art and design major supported by VR technology [J]. Design, 2019, 32 (09): 134-135.

[5] Jin Zhifeng, Liu Zhongquan, Qi Yubin, Liu Shiming. Application of sand table (model) task teaching method in the teaching of hydraulic engineering construction technology course [J]. Quality Education in Western China, 2019, 5 (03): 194-195.

[6] Chen Jun. Design and construction of deep foundation pit in sand and pebble soil layer [J]. Real Estate World, 2020 (15): 43-45.

[7] Liu Qinghua, Zhang Na, Liang Gushan. Talking about the concept and principle of pipe well and its application in construction [J]. Water Conservancy Construction and Management, 2010,30(02):32-33.

[8] Sun Wenjun. Well point method to solve the problem of water seepage in foundation pit excavation [J]. Science, Technology and economy of Inner Mongolia, 2000 (S1): 371-372.

[9] Hu Yue, Liu Guodong, Bao Weiyue, Li Jun. "influence radius" in groundwater environmental impact assessment and its determination [J]. Shanxi Science and Technology, 2015 , 30 (06): 59-62.

[10] Li Baoxia. A fast method for calculating aquifer permeability coefficient by stable pumping test of single well [J]. Journal of Wuhan University of Technology (Traffic Science and Engineering Edition), 2012,36 (05): 1025-1027.