Welcome to Francis Academic Press

International Journal of Frontiers in Engineering Technology, 2023, 5(9); doi: 10.25236/IJFET.2023.050903.

Research on Seismic Performance Evaluation of Prefabricated Reinforced Concrete Structures in High-Rise Buildings

Author(s)

Wanhe Li, Xuanqiao Che, Tingyu Wan, Ling Wu, Xiaohui Wang, Yimin Zhou, Haifeng Liu

Corresponding Author:
Wanhe Li
Affiliation(s)

Sichuan Vocational College of Chemical Technology, Luzhou, 646000, China

Abstract

With the continuous growth of urban population, people have put forward more residential requirements for construction projects. With the continuous improvement of socio-economic level and the continuous development of the construction industry, China has gradually strengthened its seismic design of reinforced concrete, aiming to improve the stability, reliability, and safety of high-rise buildings, thereby providing people with a comfortable and safe living environment. To improve the seismic, fire, and stability performance of high-rise buildings in the construction of high-rise buildings, and meet the living needs of urban residents. In the construction process of high-rise buildings, emphasizing the effective application of prefabricated concrete (PC) construction technology can greatly improve the construction efficiency and quality of high-rise buildings. At present, there are still some problems in the construction process of PC structures. Based on understanding the advantages of the application of PC structures, it is necessary to grasp the defects in the construction process, analyze the technical points of PC structure construction, and strengthen construction quality control work. This article analyzes the seismic performance of PC structures based on a certain prefabricated high-rise building project.

Keywords

High-rise buildings, Prefabricated reinforced concrete structures, Seismic performance

Cite This Paper

Wanhe Li, Xuanqiao Che, Tingyu Wan, Ling Wu, Xiaohui Wang, Yimin Zhou, Haifeng Liu. Research on Seismic Performance Evaluation of Prefabricated Reinforced Concrete Structures in High-Rise Buildings. International Journal of Frontiers in Engineering Technology (2023), Vol. 5, Issue 9: 11-14. https://doi.org/10.25236/IJFET.2023.050903.

References

[1] Zhang Jinlei. Discussion on seismic design of assembled components in reinforced concrete high-rise building engineering [J]. Production city: the first half, 2022(3): 2.

[2] Lin Baiteng. Analysis on the application of construction technology of high-rise prefabricated concrete structure [J]. Building Materials and Decoration, 2020, 000(013): 16-17.

[3] Shao Tiandong, Zhang Chunming. Seismic performance analysis of multi-storey steel-concrete structures in civil high-rise buildings [J]. Journal of Earthquake Engineering, 2020, 42(1): 10.

[4] Geng Yaoming, Liu Wenyan. Seismic design of viscous dampers for assembled monolithic concrete high-rise buildings [J]. Structural Engineer, 2018, 34(5): 6.

[5] Ma Zhilong. Analysis on the application of construction technology of prefabricated concrete structures in high-rise buildings [J]. Chinese Science and Technology Journal Database (Full-text Edition) Engineering Technology, 2022(10): 4.

[6] Cheng Dong. Application of construction technology of prefabricated concrete structure in high-rise buildings [J]. Chinese Sci-tech Journal Database (Abstract Edition) Engineering Technology, 2021 (11): 3.

[7] Zhao Zhongke. Analysis of key points in the construction of prefabricated concrete structures in high-rise buildings [J]. China New Technology and New Products, 2021(024): 000.

[8] Song Gang. Analysis on the application of construction technology of prefabricated concrete structures in high-rise buildings [J]. Automotive World, 2020, 000(011): P. 1-1.

[9] Peng Jun. Application of construction technology of prefabricated concrete structures in high-rise buildings [J]. Automotive World, 2019(030): 000.

[10] Li Cui. Construction Problems and Technical Points of Assembled Concrete Structure in High-rise Building [J]. Brick and Tile, 2022(009): 000.