Welcome to Francis Academic Press

Academic Journal of Humanities & Social Sciences, 2020, 3(2); doi: 10.25236/AJHSS.2020.030207.

Analysis of the Development Strategy of Nanjing Port under the Background of "Jianggang" Changing Into "Seaport"

Author(s)

Yao Liu

Corresponding Author:
Yao Liu
Affiliation(s)

College Of Transport & Communications, Shanghai Maritime University, Shanghai, China
[email protected]

Abstract

In order to analyze in depth the opportunities and challenges that the Nanjing Port faces after the 12.5m deep water channel below the Yangtze River and Nanjing has been put into operation. Firstly, by investigating the relevant data of the berths of Nanjing Port, the throughput, and the comparative analysis of changes in and out of the ship, the development and changes of Nanjing Port before and after the operation of the deep-water channel were obtained, and a qualitative analysis of the opportunities and challenges facing Nanjing Port. Through the construction of the SWOT-AHP model, an in-depth quantitative study is conducted to analyze how Nanjing Port grasps and handles the opportunities and challenges brought by the operation of the deep-water channel, and formulates related development strategies.

Keywords

Nanjing Port, 12.5m deep water channel, SWOT-AHP analytic model

Cite This Paper

Yao Liu. Analysis of the Development Strategy of Nanjing Port under the Background of "Jianggang" Changing Into "Seaport". Academic Journal of Humanities & Social Sciences (2020) Vol. 3, Issue 2: 67-78. https://doi.org/10.25236/AJHSS.2020.030207.

References

[1] Zhao Dezhao "Water Transport Engineering" 2019-6
[2] China Port Magazine. China Port Statistical Yearbook [J]. People's Communications Press, 2013-2019
[3] Shuangshuang, Mei Jianfei. Large ships enter the river densely, releasing "golden efficiency" The second-phase trial operation of the 12.5-meter deep-water channel below the Yangtze River and Nanjing has achieved significant results in one year [N].
[4] Huang Zhuyan, Zhang Xin. The initial opening of the 12.5m deep water channel, Nanjing Port ushers in new opportunities for development [N]. Nanjing Daily 2018-08-09
[5] Jiangsu Provincial People's Government. Three-year Action Plan for the Construction of Nanjing Seaport Hub Economic Zone (2018-2020) [Z]. 2018-04-10
[6] Erkan Celik,Emre Akyuz.An interval type-2 fuzzy AHP and TOPSIS methods for decision-makingproblems in maritime transportation engineering: The case of ship loader Ocean .Engineering, Volume 155, 1 May 2018, Pages 371-381