Welcome to Francis Academic Press

Academic Journal of Architecture and Geotechnical Engineering, 2024, 6(1); doi: 10.25236/AJAGE.2024.060110.

Research on the impact of underground box culvert underpass construction on the pier of intercity railroad bridge

Author(s)

Ye Dan

Corresponding Author:
Ye Dan
Affiliation(s)

China Railway Engineering Design and Consulting Group Co.,Ltd., Beijing, China

Abstract

Taking the new underground box culvert underpassing the special bridge of Guangzhou-Qingdao Intercity Trans-Guangdong-Qingdao Expressway in the flooding remediation project around Guangzhou Vehicle Factory as an example, the impact of the underground box culvert proximity and underpassing construction process on the proximity pier of the special bridge at Huaian Station was studied. Firstly, the settlement values and lateral and longitudinal horizontal displacement values of the underpass pier at different construction stages were obtained by on-site monitoring. Subsequently, a numerical simulation model was established by PLAXIS 3D to further analyze the dynamic response law of the pier. Finally, the construction control standards and control measures for underground box culvert underpassing high speed railway bridges are proposed through parametric analysis of the excavation proximity and excavation depth of the underground box culvert. The research results show that during the construction of new underground box culvert underpass, the settlement and displacement conditions of the pier of Guangqing Intercity Bridge across Guangqing Expressway are within the specification limits, and in order to ensure the absolute safety and smoothness of train operation, it is suggested that the excavation depth of new underground box culvert underpass should be kept within 6 m, and the excavation proximity should be kept above 5 m when it exceeds 6 m.

Keywords

underground box culvert; underpass construction; railroad bridge; field monitoring; numerical simulation

Cite This Paper

Ye Dan. Research on the impact of underground box culvert underpass construction on the pier of intercity railroad bridge. Academic Journal of Architecture and Geotechnical Engineering (2024) Vol. 6, Issue 1: 66-73. https://doi.org/10.25236/AJAGE.2024.060110.

References

[1] CHEN Zhaowei, ZHAI Wanming. Control threshold of pier settlement in high-speed railways based on train vibrations[J]. Journal of Traffic and Transportation Engineering, 2022, 22(02): 136-147.

[2] GONG Xunqiang, WANG Hongyu, LU Tieding, et al. A Settlement Curve Prediction Method of High-speed Railway Bridge Pier Based on RLM-MC[J]. Journal of the China Railway Society, 2022, 44(10): 142-149.

[3] JIANG Xiaorui, HUANG Jie, LI Nan. Discussion on Construction Control Technology and Standard of Intercity-railway Undercrossing Existing High-speed Railway by Open-cut Tunnel[J]. Railway Standard Design, 2020, 64(06): 104-111.

[4] LI Shizhong. Influence of Beijing-Hangzhou Grand Canal’s Newly Excavated Waterway on Bridge Pier of High Speed Railway[J]. Railway Engineering, 2020, 60(08): 33-36.

[5] WANG Guodong, WANG Zhijie, DUAN Mingming, et al. Research on the construction influence and protection of railway tunnel crossing beneath the pier of existing continuous rigid frame bridge[J]. Journal of Railway Science and Engineering, 2017, 14(11): 2399-2406.

[6] DONG Liang, SU Yonghua, YUAN Lei. Influence of Ground Surcharge and Unloading on Settlement of Railway Bridge Pier[J]. Railway Engineering, 2019, 59(05): 51-55.

[7] ZHOU Jimin. Construction technology and environmental impact prediction for a shield tunnel under a viaduct pile foundation group[J]. Modern Tunnelling Technology, 2016, 3(1): 165-172.

[8] MENG Changjiang, XIONG Dasheng, ZHAO Haisu, et al. Assessment of effect of dewatering of excavations on nearby piers of operating high-speed railways[J]. Chinese Journal of Geotechnical Engineering, 36(S2): 265-268.

[9] TB 10101-2018, Specification for railway engineering survey[S].

[10] TB 10182-2017, Technical regulations for highway and municipal engineering underpass high speed railway[S]. 

[11] LI Yuan-xun, ZHU Yan-peng, YE Shuai-hua, et al. Skewness distribution patterns of surface settlement considering overload effect[J]. Chinese Journal of Geotechnical Engineering, 2021, 17(S2): 840-847.