Abstract

Self-anchored suspension bridge, as a unique structure, beautiful shape and adaptable bridge type, has been widely used in urban and complex terrain bridge construction. In order to improve the overall stability of the bridge, it is proposed to study the construction technology of self-anchored suspension bridge "main cables installed ahead of stiffening girder". Taking a self-anchored suspension bridge construction project in the center of an urban area as an object, a temporary anchorage system is installed, including temporary anchorages and tension cables, to ensure the safety of lifting; inverted lifting, inverted lifting and floating crane technology are used for lifting and loading of large mid-span sections and standard girder segments, which is an innovative method to overcome the construction problems; the construction of the merging system is converted, the temporary anchorage and tension cable are gradually lifted, and the cable strength of the main cables and the suspension rods is fine-tuned, and the second-phase constant load and adjusted cable strength are applied. The second phase constant load was applied and the cable force was adjusted to the design value to ensure the overall performance and safety of the bridge. Finally, the monitoring points are designed to monitor the stress and strain in different areas. The results show that the stress values at the bottom and top of the tower are relatively stable, and the highest stress value is within 350MPa, which proves that the structural strength of the bridge after construction can meet the use requirements.

Keywords

self-anchored suspension bridge; construction technology; main girder lifting; temporary tie

Cite This Paper

Zhang Zefeng. Research on construction technology of "main cables installed ahead of stiffening girder" of self-anchored suspension bridge. Academic Journal of Engineering and Technology Science (2024) Vol. 7, Issue 6: 162-168. https://doi.org/10.25236/AJETS.2024.070623.

References

[1] Liu R .Application Strategies of Shotcrete Anchor Support Technology in Highway Bridge and Tunnel Engineering[J].Journal of Architectural Journal of Architectural Research and Development, 2024, 8(1):56-61.

[2] Xiang S , Su Q , Zhang S .Analysis of Detection and Monitoring Technology in the Construction and Maintenance of Large Bridges[J]. Architectural Research and Development, 2024, 8(3):134-139.

[3] Luo Y , Yan Q , Chen Z Y .Study of Causes and Preventive Measures of the Support System Settlement Accident during Cast-In-Situ Bridge Construction: a Case Study[J].Journal of Bridge Engineering, 2024, 29(3):1.1-1.21.

[4] Weiming Z, Mingda Z. Comparison and Selection of Arch-Rib Construction Schemes for Continuous Beam arch Composite Bridge of High Speed Railway[J].Chinese Railways, 2023(2):35-43.

[5] Liu R .Analysis of the Application of Span-Bridge Technology for Building Highway Tunnels that Go Over Solutional Caves[J]. Journal of World Architecture, 2024, 8(1):103-107.

[6] Pramanik S , Saha P , Ghosh P M C .Substrate Switchable Pathway for Selective Construction of Bridged Dibenzo[b,f][1,5]diazocines and Bridged Spiromethanodibenzo[b,e]azepines[J].acs omega, 2023, 8(23):20579-20588.

[7] Huang D , Nie X , Zeng J J Y .Experimental and numerical analysis on flexural behavior of improved U-bar joint details for accelerated bridge construction[J].Engineering structures, 2023, 289(Aug.15):1.1-1.17.

[8] Atashgah K M , Ghousi R , Nasrabadi A M A T .A Development Model For Identifying The Uncertainty Sources And Their Impacts On Bridge Construction Projects[J].The Baltic journal of road and bridge engineering, 2023, 18(1):140-166. 

[9] Maorui W , Min Z .Diastereoselective construction of carbo-bridged polyheterocycles by a three-component tandem annulation reaction[J].Organic & biomolecular chemistry, 2023, 21(31): 6342-6347.

[10] Peskova Z .Bridge in Slany:A Conjunction of History,Modern Technology and Sensitive Architectural Approach[J]. Journal of Civil Engineering and Architecture, 2024, 18(4):175-185.

[11] Liu R .Discussion on Construction Technology of Subway Tunnel Expansion under Bridge Foundation [J]. Journal of Architectural Research and Development, 2024, 8(2):37-42.

[12] Wang H , Guo J , Yang S ,et al.Numerical Analysis of Cold-Formed Thin-Walled Steel Short Columns with Pitting Corrosion during Bridge Construction[J ].Structural Durability & Health Monitoring, 2024, 18(2):181-196. 

[13] Liu R .Construction Technology of Pile Foundation for Subway Tunnel Crossing Bridge [J].Journal of World Architecture, 2024, 8(2):37-42.

[14] Ye Z , Liu T , Xiao B .Preparation Of Polyacrylamide Konjac Gum Double Network Gel Liquid Bridge Plug[J].Chemistry and Technology of Fuels and Oils, Chemistry and Technology of Fuels and Oils, 2024, 60(1):113-118.

[15] Yang Q .Analysis of Road Bridge Repair and Strengthening Construction Technology[J].Journal of Architectural Research and Development, 2024, 8( 3):128-133.