Academic Journal of Engineering and Technology Science, 2020, 3(7); doi: 10.25236/AJETS.2020.030718.
Xunhua Yin1, *
1 School of Civil Engineering and Architecture,University of Jinan, China
*Corresponding author
Bored pile foundation treatment is an effective method for soft soil treatment of medium and high-rise residential buildings, structures, ports and wharves. This paper mainly discusses the reasons why the pouring concrete volume far higher than the design value when bored piles are selected for foundation treatment under special karst geological conditions by combining with geological survey, drawing design, pile foundation investigation and site construction.Thus choose the best project visa processing program.
bored pile, karst geology, design value, Engineering visa
Xunhua Yin. Analysis on Foundation Treatment Process and Engineering Visa Scheme of Special Karst Stratum. Academic Journal of Engineering and Technology Science (2020) Vol. 3 Issue 7: 179-190. https://doi.org/10.25236/AJETS.2020.030718.
[1] Liu geqi, Zhang Huijun. Quality control of bored pile construction technology [J]. Tianjin Construction technology, 2010 (3): 20-22
[2] Zhao Xiaoli. Cost management of bored pile construction [C]. Shanxi architecture, 2012, 38 (18): 254
[3] sc01-31-2016. Consumption quota of construction projects in Shandong Province [S]