Welcome to Francis Academic Press

Academic Journal of Engineering and Technology Science, 2021, 4(1); doi: 10.25236/AJETS.2021.040101.

Production scheduling problem of automobile mixed model assembly line

Author(s)

Jiahui Lin*, Huitong Li, Xiao Li

Corresponding Author:
Jiahui Lin
Affiliation(s)

Shandong University of Science and Technology, 266590, China
*Corresponding Author

Abstract

Nowadays, the mode of production has changed from mass production to multi variety and small batch production, and mixed model assembly line has emerged. Mixed model assembly is widely used in automobile enterprises. This paper summarizes the theory and method of automobile mixed model assembly line scheduling, analyzes its characteristics and difficulties, summarizes the related optimization objectives, and introduces the related algorithms, so as to make the scheduling problem of mixed model assembly line more clear.

Keywords

Automobile industry, mixed model assembly line, production scheduling

Cite This Paper

Jiahui Lin, Huitong Li, Xiao Li. Production scheduling problem of automobile mixed model assembly line. Academic Journal of Engineering and Technology Science (2021) Vol. 4 Issue 1: 1-3. https://doi.org/10.25236/AJETS.2021.040101.

References

[1] Areus A L.An Analysis of a Compture Method of Sequencing Assembly Line Operations [D]. University Of California, Berkeley, 1963.
[2] Miltenburgl J.Level schedules for mixed-model assembly lines in just-in-time production systems [J]. Management Science, 1989, 35 (1): 192-207.
[3] Bard J F,Shtub A, Joshi S B. Sequencing mixed model assembly lines to level parts usage and minimize line length [J]. International Journal of Production Research, 1994, 32: 2431-2454.
[4] Kotani.S, Ito T, Ohno K, Sequencing problem for a mixed-model assembly line in the Toyota production system [J]. International Journal of Production Research. 2004, 42 (23): 4955-4974.
[5] Su Ping, Yu Zhao Qin. Research on multi objective optimization method for balancing problem of mixed model assembly line [J]. China Mechanical Engineering, 2009, 20 (19): 2342-2347
[6] Wu Yongming. Research on advanced planning and scheduling method of flexible production line based on GAIPSO algorithm [J]. Modular machine tool and automatic processing technology, 2019 (4): 10-13, 19