Welcome to Francis Academic Press

International Journal of Frontiers in Engineering Technology, 2021, 3(7); doi: 10.25236/IJFET.2021.030710.

New Progress in Application of Temporary Plugging and Diversion Technology

Author(s)

Shunhao Mei1, Xiu Yan1, Juzheng Zhang1 and Zhiyao Zhu2

Corresponding Author:
Shunhao Mei
Affiliation(s)

1Jianghan Petroleum Engineering Company, Wuhan, China

2Jianghan Oil Field Jianghan Oil Production Plant, Qianjiang, China

Abstract

Temporary plugging and diversion technology is simple in operation, low in overall cost, good in adaptability under different target conditions and low in construction risk. It has been widely used in Hydraulic fracturing in China. In the process of Hydraulic fracturing, timely and appropriate temporary plugging agent can effectively plug the fully transformed area, retransform the incomplete transformed area, increase the fracture contact area, improve the fracture complexity, finally realize the full coverage of the transformed section, improve the operation efficiency, and ultimately create economic benefits. The application examples of temporary plugging diversion technology in the three well conditions of refracturing well, casing variable well and infill perforation well are analyzed and summarized. The characteristics of fracturing curve and microseismic monitoring show that the microseismic events increase in most of the well reconstruction section after temporary plugging, and the improvement effect is obvious.

Keywords

Hydraulic fracturing, Encryption perforation, plugging, transition direction

Cite This Paper

Shunhao Mei, Xiu Yan, Juzheng Zhang and Zhiyao Zhu. New Progress in Application of Temporary Plugging and Diversion Technology. International Journal of Frontiers in Engineering Technology (2021), Vol. 3, Issue 7: 56-60. https://doi.org/10.25236/IJFET.2021.030710.

References

[1] Zou Caineng, Dong Dazhong, Wang Yuman, Li Xinjing, Huang Jinliang, Wang Shufang, et al. Petroleum exploration and development, 2016,43 (2): 166-178.

[2] Chen Zhaowei, SHI Lin, Xiang Degui, et al. Casing deformation mechanism and countermeasures in the changning-weiyuan shale gas demonstration area [J]. Natural gas industry, 2016, 36 (11): 70-75. 

[3]Gomaa A M, Nino-Penaloza A, Mccartneye, et al.Engineering solid particulate diverter to control fracture complexity[R].SPE 179144,2016.

[4] Ma Ru ran, Liu Yin, Chang Qing. Oil field chemistry, 2013, 31 (6): 91-95.

[5] Zeng Bin, Li Wenhong. Successful Application of Natural Selection Sweet Spot Temporary Plugging Volume Refracturing In Xinjiang Oilfield [J]. Contemporary chemical industry, 2019, 48 (01): 130-134.

[6] Xiang Xujin, Hu Guangzhen, Chen Shuqing. Journal of oil and gas technology, 2004, 26 (1): 97-98.

[7] Yang Yi, Liu Junchen, Zeng Bo, Yang Xinrui, Huang Haoyong. China petroleum machinery, 2017, 45 (12): 82-87. 

[8]Zhu J,Forrest J,Xiong H J,et al. Cluster spacing and well spacing optimization using multi-well simulation for the lower Spraberry shale in Midland basin[R]. SPE 187485, 2017.