Research on Optimization of Construction Project Investment Evaluation Based on Big Data

Author(s)

Yin Bai

Corresponding Author:
Yin Bai
Affiliation(s)

Liaoning Institute of Science and Technology, Benxi, 117004, China

Abstract

The evaluation and optimization of construction project investment is ultimately to evaluate the risks and benefits of the project, and the evaluation indicators and standards must take into account China's economy and enterprises. The risk factors that affect the investment projects of construction projects come from various aspects. The cost of the project depends on the implementation process and investigation methods in the project operation. In this paper, the optimization research of construction project investment evaluation based on big data is carried out. This paper introduces a risk assessment method based on BPNN (Back propagation neural network). We normalized the attribute values of various indicators used for project risk assessment, and sent them as input samples from the input layer. After being processed layer by layer by hidden layers, they were transmitted to the output layer, and finally the output of the system was taken as the evaluation target. The author verified it with an example, which shows that it is feasible to use BPNN to evaluate and optimize the construction project investment.

Keywords

Big data; Construction project; Investment evaluation

Cite This Paper

Yin Bai. Research on Optimization of Construction Project Investment Evaluation Based on Big Data. International Journal of Frontiers in Engineering Technology (2023), Vol. 5, Issue 1: 57-61. https://doi.org/10.25236/IJFET.2023.050109.

References

[1] Chen Bin, Wang Lei,&Liu Qunying. (2017). Research on ppp Project Risk Assessment Model Based on AHP-Entropy Method. Journal of Engineering Management, 31(2), 5.

[2] Si Ruo, & Zhang Qiang. (2016). Research on Index and Method System of Film Project Risk Assessment. Contemporary Film, 2016(2), 6.

[3] Feng Huihong, Wei Jingjing, Yang Ke,&Tan Chaoqun. (2016). Application of Entropy Weight-Fuzzy Evaluation Method in Risk Assessment of bt Highway Project. Highway, 61(1), 7.

[4] Ma Shaochao, & Zhan Wei. (2016). Research on Risk Assessment and Risk Sharing of Contract Energy Management Project from the Perspective of esco. Science and Technology Management Research, 36(12), 6.

[5] Wang Wenyin, Liu Lixia,&Li Jia. (2016). Research on Risk Evaluation of ppp Infrastructure Projects Based on pca-bp. Friends of Accounting, 2016(7), 4.

[6] Liu Longlong,&Liu Xilin. (2017). Risk Assessment of Tourism Development Projects Based on Fuzzy Comprehensive Evaluation Model-Taking Zhulinguan Scenic Spot in Qinling Mountains as an Example. Henan Science, 035(010), 1722-1728.

[7] Guo Qi, Huang Jiaqi, Zhang Yang,&Lu Yahuan. (2017). Research on risk assessment of foreign hydropower epc projects based on improved ahp method. Engineering Research: Engineering from an interdisciplinary perspective, 9(6), 7.

[8] Yang Qing, Zheng Lu,&Zou Xingqi. (2021). Risk Evaluation of Complex R&D Projects Based on Risk Communication Network and k-shell Method. Management Review, 33(9), 9.

[9] Wang Zhenshuang, Sun Jianshu, Zhou Yanxin, & Zhao Ning. (2021). Study on the index system of risk assessment of ppp project for resource treatment of construction waste. Journal of Engineering Management, 035(003), 58-63.

[10] Wang Jing, Song Huiping,&Gao Maolong. (2020). Application of two risk assessment methods in occupational hazard assessment of a comprehensive experimental building construction project of a research institute. Occupation and Health, 36(21), 5.